Deck permits · Port Moody, BC
Do you need a permit for a deck in Port Moody?
Yes. Port Moody lists decks among projects that need a building permit, with no exemption stated.
What the rules say
Port Moody's deck permit rules
Port Moody's Building and Renovating page states 'A building permit is required before any new construction takes place' and lists decks among projects that require permits. No height or size exemption for decks is stated.
Official source
Port Moody building permitsRules and fees change. Always confirm with the municipality before you build.
Before you apply
What a Port Moody deck permit usually involves
- A site plan showing the deck, property lines and setbacks
- Drawings: foundation or footing plan, framing plan, cross-section and elevation
- Guard and stair details
- Engineering for high, covered or unusual decks
- Lot coverage or floor area numbers where zoning needs them
- Inspections during the build, usually footings and framing, then final
A general guide. Port Moody may ask for more or less depending on the project.
Questions
Port Moody deck permit questions
Do I need a permit for a deck in Port Moody?
Yes. Port Moody lists decks among projects that need a building permit, with no exemption stated.
Do covered decks need a permit in Port Moody?
Port Moody doesn't publish a separate rule for covered decks that we could find. Roofs attached to a house generally need a permit, so ask the municipality or your builder.
Who applies for a deck permit in Port Moody?
Usually your deck builder prepares the drawings, applies and books inspections as part of the job. Check that the permit, drawings and any engineering are included in each quote.
Deck permits nearby
Get quotes from builders who know Port Moody
Up to 3 vetted local deck builders. Free, no obligation.